Liberty Tutors Ask a tutor

BUSI 615 Week 6 Weekly Integrated Learning Project 6: How to Write It

This guide is for BUSI 615 Week 6 Weekly Integrated Learning Project 6, start to submission. The sixth team project: transportation and capacity planning for your firm.

BUSI 615 is Logistics, 3 credit hours, in Liberty University's MBA. Canvas and the course guide file print the code as BUSI615; it is the same course.

CourseBUSI 615 Logistics
Module/Week6
Points75 points
LengthNot set in the guide; follow the course content instructions
SourcesThe custom text and your firm's data
Faith integrationNot required by the guide
FormatTeam Excel workbook as instructed

What BUSI 615 Week 6 Weekly Integrated Learning Project 6 asks for

Project 6 is due in Module/Week 6 with the chapters on transportation and capacity planning. Worth 75 points.

Where it fits in BUSI 615

In the published schedule, Weekly Integrated Learning Project 6 is one of 13 graded written assignments in BUSI 615. It follows Week 5 Weekly Integrated Learning Project 5 and comes before Week 7 Discussion Board 4: Implementing an Integrated Logistics System.

How BUSI 615 Week 6 Weekly Integrated Learning Project 6 is graded

Liberty grades Weekly Integrated Learning Project 6 with the rubric attached to the assignment in Canvas, worth 75 points in the published guide. That is about 7% of the course's 1,010 points. The rubric rows are the real instructions. Draft against them, and you will rarely be surprised by the grade.

Course grades in BUSI 615 use Liberty's point scale: an A is 940 to 1010 points of the course total. Missing the length or source minimum usually costs points on several rows at once, which is why the checklist below starts with them.

Timing in the published guide: Each course module/week (except Module/Week 1) begins on Saturday morning at 12:00 a.m. (ET) and ends on Friday night at 11:59 p.m. (ET). Check the due dates in your Canvas section, which govern.

The BUSI 615 Week 6 method, step by step

  1. See where this piece sits in the project

    Weekly Integrated Learning Project 6 is one stage of a larger project. Read the full project description first so this stage feeds the final submission instead of standing alone.

  2. Choose a subject you can research

    Choose a subject with plenty of public data. Every later stage will need facts about it.

  3. Answer the questions this stage asks

    Turn each question in the stage instructions into a heading and answer it with specifics about your subject, not general theory.

  4. Apply the course model

    Bring in the course framework the stage expects and apply it explicitly to your subject's facts.

  5. Support with sources

    Cite the facts you use (The custom text and your firm's data). Industry reports, filings and journal articles carry more weight than websites with no author.

  6. Format, length and teamwork

    Check length (Not set in the guide; follow the course content instructions) and APA. For group stages, split the sections early and leave a day for one person to unify the voice.

Show load against capacity by week in a chart, and resolve any overload (overtime, shifting orders, outsourcing). For transport, compare truckload and less-than-truckload costs for your shipment sizes.

A structure for BUSI 615 Week 6 Weekly Integrated Learning Project 6

Word targets are planning numbers for about 1,000 words of body text, set by the length in the guide; the rubric decides where to spend more.

SectionWhat it must doTarget
Capacity planLoad versus available capacity.~400 words
Transport planShipments, modes and costs.~400 words
AdjustmentsHow overloads are resolved.~200 words

A topic angle that works

Capacity requirements planning converts planned orders into hours at each work center and compares them with available capacity; transport requirements planning converts planned shipments into loads, modes and costs.

Model paragraph with notes

An original paragraph written by our desk to show the register that earns full rubric credit. It is study material: learn the moves, then write your own.

BUSI 615 Week 6, sample capacity notes

Assembly needs 0.8 labor hours per chair. Planned orders of 1,300 chairs in week 4 require 1,040 hours against 960 available, an overload of 80 hours. Moving 100 chairs to week 3, which has spare capacity, removes the overload without overtime. Shipments of 500 chairs fill one truck, so full truckloads are the cheapest mode to both distribution centers.

  1. Load versus capacity.
  2. A fix.
  3. A transport choice.

Mistakes that cost points on BUSI 615 Week 6

  • Overloads left unresolved.
  • No transport costs.
  • Disconnected from MRP and DRP.

Checklist before you submit

  • Length: Not set in the guide; follow the course content instructions
  • Sources: The custom text and your firm's data
  • Every question in this stage's instructions answered
  • Consistent with the subject chosen in earlier stages
  • Each rubric row read against the section that answers it

Questions students ask

When is BUSI 615 Project 6 due?

In Module/Week 6.

How many points is BUSI 615 Week 6 Weekly Integrated Learning Project 6 worth?

75 points in Liberty's published course guide for BUSI 615, out of a course total of 1,010 points (about 7% of the grade). The rubric attached to the assignment in Canvas shows how those points are divided.

Is BUSI 615 Week 6 the same in every section of BUSI 615?

This guide follows Liberty's published course guide for BUSI 615. Liberty notes that course content can change from term to term, so if your Canvas section shows different instructions, a different week or different points, follow Canvas and your instructor.

Want a tutor to look at your draft?

Send the instructions and what you have so far. A Liberty tutor replies with what to fix first, usually within the hour.

Ask a tutor

More in BUSI 615

Liberty Tutors deskUsually replies in a few minutes