This guide is for BUSI 760 Week 5 Dissertation Prospectus, start to submission. A prospectus outlining a possible dissertation study, following the requirements in the course content.
BUSI 760 is Quality Management and Productivity, 3 credit hours, in Liberty University's Doctor of Business Administration. Canvas and the course guide file print the code as BUSI760; it is the same course.
| Course | BUSI 760 Quality Management and Productivity |
|---|---|
| Module/Week | 5 |
| Points | 150 points |
| Length | Not set in the guide; requirements are in the course content |
| Sources | Peer-reviewed research |
| Faith integration | Not required by the guide |
| Format | As instructed in the course content |
What BUSI 760 Week 5 Dissertation Prospectus asks for
The course requires 1 dissertation prospectus; its specific requirements, rubric and due date are in the course content. It is due in Module/Week 5 with Plenert chapters 8 and 9 and Keller chapters 1 to 3. Worth 150 points.
Where it fits in BUSI 760
In the published schedule, Dissertation Prospectus is one of 6 graded written assignments in BUSI 760. It follows Week 5 Discussion Board Forum 3 and comes before Week 7 Strategic Quality Management Implementation Plan. The same week also has Discussion Board Forum 3, so plan the week's writing together.
How BUSI 760 Week 5 Dissertation Prospectus is graded
Liberty grades Dissertation Prospectus with the rubric attached to the assignment in Canvas, worth 150 points in the published guide. That is about 15% of the course's 1,000 points. The rubric rows are the real instructions. Draft against them, and you will rarely be surprised by the grade.
Timing in the published guide: Each course week begins on Monday morning at 12:00 a.m. (ET) and ends on Sunday night at 11:59 p.m. (ET). The final week ends at 11:59 p.m. (ET) on Friday. Check the due dates in your Canvas section, which govern.
The BUSI 760 Week 5 method, step by step
Read this part against the whole
Before drafting Dissertation Prospectus, read ahead to the later parts. Each part builds on the last, and a decision that looks fine now can box you in two weeks later.
Lock the topic and the question early
Commit to one problem and one answerable question. In BUSI 760, the parts that follow depend on that question, so time spent sharpening it here is saved later.
Write to the headings the part names
Mirror the instructions: each element the part names becomes a heading. It makes the grading easy to follow and makes it obvious when something is missing.
Support every claim with current evidence
Cite as you write (Peer-reviewed research). Prefer peer-reviewed sources from the last five years and say what each one contributes; a citation that only decorates a sentence adds little.
Keep the draft consistent with earlier parts
Reuse the same terms, population and question you used before, and fix anything your instructor flagged in feedback on the previous part. Graders notice when a proposal changes its question halfway through.
Check length and APA before submitting
Check the part against its share of the total length (Not set in the guide; requirements are in the course content) and apply current APA throughout. A part that runs far over its share usually contains material that belongs in a later section.
Start from a specific problem you have seen in practice and find the research gap around it. Make sure the research questions can be answered by the proposed design within a DBA's time and access.
A structure for BUSI 760 Week 5 Dissertation Prospectus
Word targets are planning numbers for about 1,300 words of body text, set by the length in the guide; the rubric decides where to spend more.
| Section | What it must do | Target |
|---|---|---|
| Problem | A researchable business problem. | ~360 words |
| Purpose and questions | What the study would answer. | ~360 words |
| Method | A feasible design. | ~310 words |
| Significance | Value to practice. | ~160 words |
| Format | As instructed. | ~100 words |
A topic angle that works
A prospectus is a short plan for a dissertation: the problem, purpose, research questions, a brief review of the literature, the proposed method and the significance. A topic in quality management or productivity connects it to this course.
Model paragraph with notes
An original paragraph written by our desk to show the register that earns full rubric credit. It is study material: learn the moves, then write your own.
Many small manufacturers adopt lean practices but abandon them within two years, and research has studied lean mostly in large firms. The purpose of this qualitative study is to explore why small manufacturers in the Southeast discontinue lean initiatives. Interviews with owners and plant managers at 12 to 15 firms would identify the barriers they experienced.
- A problem and gap.
- A purpose.
- A feasible design.
Mistakes that cost points on BUSI 760 Week 5
- A topic too broad for a DBA.
- Questions the method cannot answer.
- No literature gap.
Checklist before you submit
- Length: Not set in the guide; requirements are in the course content
- Sources: Peer-reviewed research
- Matches the topic and question used in the earlier parts
- Instructor feedback on the previous part applied
- Each rubric row read against the section that answers it
Questions students ask
When is the BUSI 760 dissertation prospectus due?
In Module/Week 5.
How many points is BUSI 760 Week 5 Dissertation Prospectus worth?
150 points in Liberty's published course guide for BUSI 760, out of a course total of 1,000 points (about 15% of the grade). The rubric attached to the assignment in Canvas shows how those points are divided.
Is BUSI 760 Week 5 the same in every section of BUSI 760?
This guide follows Liberty's published course guide for BUSI 760. Liberty notes that course content can change from term to term, so if your Canvas section shows different instructions, a different week or different points, follow Canvas and your instructor.
Want a tutor to look at your draft?
Send the instructions and what you have so far. A Liberty tutor replies with what to fix first, usually within the hour.