This guide is for BUSI 338 Week 8 Final Project Report, start to submission. The fourth and final 10 to 12-slide phase, completing the new venture project.
BUSI 338 is Developing Entrepreneurial Opportunities, 3 credit hours, in Liberty University's BS in Business Administration. Canvas and the course guide file print the code as BUSI338; it is the same course.
| Course | BUSI 338 Developing Entrepreneurial Opportunities |
|---|---|
| Module/Week | 8 |
| Points | 90 points |
| Length | 10 to 12 slides |
| Sources | At least 2 outside references, at least 1 peer-reviewed |
| Faith integration | At least 1 biblical reference relevant to the content |
| Format | Microsoft PowerPoint; current APA references |
What BUSI 338 Week 8 Final Project Report asks for
The final project report, the fourth phase presentation, is due in Module/Week 8 with Megginson and Byrd chapter 16 and an article, the same week as Exam 4; the final week ends Friday at 11:59 p.m. (ET). Same requirements as the earlier phases. Worth 90 points.
Where it fits in BUSI 338
In the published schedule, Final Project Report is one of 9 graded written assignments in BUSI 338. It follows Week 7 Discussion Board Forum 4, and it is the last written assignment in the course.
How BUSI 338 Week 8 Final Project Report is graded
Liberty grades Final Project Report with the rubric attached to the assignment in Canvas, worth 90 points in the published guide. That is about 9% of the course's 1,010 points. Read the rubric first. Each row is a criterion, and the wording of the highest column is the closest thing you have to a model answer.
Course grades in BUSI 338 use Liberty's point scale: an A is 900 to 1010 points of the course total. Missing the length or source minimum usually costs points on several rows at once, which is why the checklist below starts with them.
Timing in the published guide: Each course module/week (except Module/Week 1) begins on Tuesday morning at 12:00 a.m. (ET) and ends on Monday night at 11:59 p.m. (ET). The final module/week ends at 11:59 p.m. (ET) on Friday. Check the due dates in your Canvas section, which govern.
The BUSI 338 Week 8 method, step by step
Plan the talk before the slides
Write the message of the Final Project Report in two sentences, then outline the points that support it. Slides built before the message tend to become a stack of facts.
One idea per slide
Each slide carries one point, stated in its title. Short lines, readable type, no paragraphs on the slide.
Put the evidence where it is used
Cite sources on the slides where you use them and list them on a references slide (At least 2 outside references, at least 1 peer-reviewed).
Write speaker notes or a script
Write notes for each slide in full sentences. They keep the recording on time and give the grader the reasoning the slides only point to.
Rehearse to the time limit
Record a practice run and time it. Cut slides rather than speeding up; a rushed recording hides the points you worked on.
Check the technical requirements
Before submitting, check the slide count and timing (10 to 12 slides), that audio plays, and that the link or file opens for someone else.
End with a short roadmap slide (next 12 months) so the project reads as a plan, not four separate decks.
A structure for BUSI 338 Week 8 Final Project Report
Word targets are planning numbers for about 1,000 words of body text, set by the length in the guide; the rubric decides where to spend more.
| Section | What it must do | Target |
|---|---|---|
| The final management factor | What and why. | ~160 words |
| Competitive analysis | Rivals. | ~240 words |
| Market research | Evidence. | ~220 words |
| Your plan | Decisions. | ~200 words |
| Venture summary | How the four phases fit together. | ~180 words |
A topic angle that works
Use the last phase to bring the venture together: cover the final management factor and close with a slide summarizing how the four phases form one plan.
Model paragraph with notes
An original paragraph written by our desk to show the register that earns full rubric credit. It is study material: learn the moves, then write your own.
Slide 11 brings the venture together: an LLC (Phase 1) with trained allergen-safe staff (Phase 2), funded by a microloan with cash positive by month five (Phase 3), and a succession and growth plan (this phase). The next twelve months focus on 20 parties a month and a second kitchen day.
- Integrates phases.
- A roadmap.
- Clear next steps.
Mistakes that cost points on BUSI 338 Week 8
- No integration.
- Missing sources.
- Over 12 slides.
Checklist before you submit
- Length: 10 to 12 slides
- Sources: At least 2 outside references, at least 1 peer-reviewed
- Faith integration: At least 1 biblical reference relevant to the content
- Slide count and time limit within the guide's numbers
- Audio, notes or video included if the guide asks
- Each rubric row read against the section that answers it
Questions students ask
What is the last BUSI 338 project assignment?
The final project report, the fourth phase presentation, in Module/Week 8.
How many points is BUSI 338 Week 8 Final Project Report worth?
90 points in Liberty's published course guide for BUSI 338, out of a course total of 1,010 points (about 9% of the grade). The rubric attached to the assignment in Canvas shows how those points are divided.
Is BUSI 338 Week 8 the same in every section of BUSI 338?
This guide follows Liberty's published course guide for BUSI 338. Liberty notes that course content can change from term to term, so if your Canvas section shows different instructions, a different week or different points, follow Canvas and your instructor.
Want a tutor to look at your draft?
Send the instructions and what you have so far. A Liberty tutor replies with what to fix first, usually within the hour.